• CEP/IRP Stakeholder Feedback Form

  • Format: (000) 000-0000.
  • Modeling refinements: Are the modeling refinements we’ve described clear to you, and do they make sense?
  • External studies: Beyond the external studies we presented, are there others you think we should consider?
  • Timeline: Does the 2026 CEP/IRP timeline feel clear and workable from your perspective?
  • 10/22/25

  • CORPORATE LOAD FORECAST:

  • DRAFT ADOPDER FORECAST:

  • RESOURCE TOPOLOGY:

  • Aurora (Model) Topology - Are the modeling refinements described clear to you? And do they make sense?
  • FUTURES/MARKETS:

  • 12/10/2025

  • Supply-Side Resource Options

  • Capacity Need & It’s Drivers

  • Transmission Options

  • Role of the VPP in the IRP

  • Energy Efficiency (EE) Integration into IRP

  • 01/14/2026

  • Local Transmission Planning

  • Resource Contract Extension Update

  • Flexibility Study Overview

  • Clean Energy Plan – Overview

  • Community Benefit Indicators (CBIs)

  • Portfolio/Scenario Designs

  • IRP Emissions Forecasting

  • Flexibility Study Draft Results

  • CBRE Update

  • Clean Energy Plan & Integrated Resource Plan Community Engagement Updates

  • Diverse Market Transmission Framework

  • Portfolio Scoring

  • ELCCs

  • RFP Update and Proxy

  • Community Engagement

  • Transmission Constraints: Methodology & Approach

  • Price Futures Update

  • Energy Values for Resources

  • Generic Resource Cost Update

  • Market Emission Factor Scenarios

  • Community Benefit Indicators (CBIs):

  • Portfolio Analysis Scenarios

  • Cost Cap Scenario Update

  • Transmission Constraints: Results & Analysis

  • VPP Integration & ELCC Review

  • Other:

  • Should be Empty: