• CEP/IRP Stakeholder Feedback Form

  • Format: (000) 000-0000.
  • 10/22/25

  • CORPORATE LOAD FORECAST:

  • DRAFT ADOPDER FORECAST:

  • RESOURCE TOPOLOGY:

  • FUTURES/MARKETS:

  • 12/10/2025

  • Supply-Side Resource Options

  • Capacity Need & It’s Drivers

  • Transmission Options

  • Role of the VPP in the IRP

  • Energy Efficiency (EE) Integration into IRP

  • 01/14/2026

  • Local Transmission Planning

  • Resource Contract Extension Update

  • Flexibility Study Overview

  • Clean Energy Plan – Overview

  • Community Benefit Indicators (CBIs)

  • Portfolio/Scenario Designs

  • IRP Emissions Forecasting

  • Flexibility Study Draft Results

  • CBRE Update

  • Clean Energy Plan & Integrated Resource Plan Community Engagement Updates

  • Diverse Market Transmission Framework

  • Portfolio Scoring

  • ELCCs

  • RFP Update and Proxy

  • Other:

  • Should be Empty: